Search on this blog

Search on this blog

View Categories

10.2 CRC Installation Overview

< 1 min read

Table of Contents


In this chapter we will be installing the Data Repository (CRC) Cell.

Order of Installation #

The basic steps that will be taken during this installation are as follows:

Step 1:   Stop services (WildFly)
Step 2:   Edit CRC Loader configuration files
Step 3:   Edit CRC configuration files
Step 4:   Deploy the CRC Cell
Step 5:   Start services (WildFly)
Step 6:   Update CRC Data in i2b2 Admin
Step 7:   Update path in CRC table
Step 8:   Verify installation



Important

The details of what is to be done for each step are defined in the different sections within this chapter. It is important to follow steps in the order they are defined and not to skip any of them unless otherwise noted.